SONY DSC

BEFORE

Previous to any finishing, the attic had some serious issues to address.

We strapped out the ceiling and added soy based spray foam insulation to the rafter bays.

We brought in our engineer and corrected several structural issues, including construction of proper supporting knee walls and collar ties, creation of a new floor to meet the load requirements, and building of a new winder staircase in a different configuration.

Most significantly, we lifted the sagging front dormer and the roof of the front porch almost seven inches.

Both comments and trackbacks are currently closed.